With over 100,000 orders
With over 100,000 orders
Before beginning the installation, it is essential to prepare the area with precision. Start by ensuring the substrate is dry, clean, and structurally sound. Remove all debris, dust, and loose materials. The bottom should be placed level since any movement or water infiltration may compromise the integrity of the installation.
Scribing and taking measurement points will keep everything aligned in the process. Install the appropriate configuration for the Wedi shower system. Depending on the shape and dimensions of the space, choose the correct base and panels for the walls. It is greatly recommended that the components be dry-fitted first to avoid incorrect positioning and fit. Make sure the drain's position aligns with the pre-formed base before moving on to install the parts.
Apply Wedi joint sealant in the pre-molded channels of the shower base. Firmly set the base into place and ensure it is level. Any adjustments should be made immediately before the sealant cures.
Next, insert the drain assembly according to the manufacturer’s guidelines using approved waterproofing materials. Secure the drain connection tightly to avoid leaks. For wall panel installation, begin with the back panel. Apply adhesive beads or Wedi joint sealant to the contact points. Firmly press the panel against the substrate, ensuring complete contact. Use washers and Wedi screws to secure the panel, maintaining consistent spacing.
Repeat the process with the side panels, applying sealant to the edges for a fully integrated waterproof barrier. The Wedi shower system provides interlocking components that simplify alignment and improve long-term performance. Every joint should be sealed completely using Wedi joint sealant and reinforced with approved Wedi sealing tape where applicable. Careful attention to sealing ensures water-tight protection throughout the structure.
Once all panels are installed, revisit each seam and penetration to ensure a continuous waterproof seal. Apply additional joint sealant where needed and smooth it out for uniform coverage. Allow the sealant to cure based on the manufacturer’s guidelines before the tiling begins. This curing period is critical to ensure maximum bond strength and water resistance.
Pre-sloped shower bases in the Wedi shower system make tiling more efficient and minimize on-site modifications. Before applying tile adhesive, verify all surfaces are clean and free from dust or loose particles. Use suitable thin-set mortar recommended for foam backer boards, and begin tiling from the center outward to maintain even tile spacing and layout symmetry.
The installation process concludes with grouting and final detailing. After grouting is complete, wipe down all surfaces and perform a final inspection to confirm all materials are properly bonded and no gaps remain in the waterproofing. This final step is vital for performance and durability.
At Tile This LLC, we take pride in offering trusted solutions that help installers throughout every phase of their job. The Wedi shower system is the ideal combination of efficiency, dependability, and user-friendliness for effective installation.
Visit us today and view our full array of installation systems and tools designed for top performance.